Construction Panorama (August 10, 2010)
A panorama view of the brewery space before the pre-concrete fill was spread. Photo taken August 10, 2010.
Construction Images from July 13th, 2010
- The floor of “The Pit” before floor drains are installed and a new concrete pad is poured (7/13/10)
- Almost all the floor boards had been removed by July 13th
- The foundation is a mess under our future office space (07/13/10)
- Retaining wall base, built 07/07/10
Ground Breaking
Here are some images of the ground breaking!