071310 06

071310 06

The floor of "The Pit" before floor drains are installed and a new concrete pad is poured (7/13/10)

The floor of “The Pit” before floor drains are installed and a new concrete pad is poured (7/13/10)

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>